Just finished making, installing and setting up my first roller bass machine, so here's some photos of the process.
I'm not going to cover how you link the rollers to the pallets as there are many different approaches - pick the one you like.
Also, being a lazy bugger, I've just re-cycled the pallet-lever assembly from an old accordion instead of making my own.
If making rollers by hand you have to resort to large-diameter rollers. You can get away with 3mm but it's extremely difficult to do that without wasting a bucket of rods. 4mm gives you a lot more room for error.
I chose titanium for the rollers as it's light and stiff. Brass or stainless steel are valid alternatives.
The posts are simply riveted into the rollers - even with a semi-decent riveting job there's no need for silver brazing.
Posts are brass, 1.6mm in my case.
Rollers are drilled to 1.5mm - see the riveting part for the explanation.
1) Mark your rollers for drilling. File a wee flat (in fact, I used a round file, so it's a concave "flat") so you can register an automatic punch on it. Punch the rollers in preparation for drilling.
(Test piece of Ti rod is used here).

2) Drill the rods. Be very careful to drill down the middle of the rod. If you are off centre and leave the walls too thin, they can break when riveting.
If drilling ti, go very slow with lots of lube. Why? Ask the 12 drill bits that I broke while drilling 80 holes

I went a step further and reamed the holes with 1.50mm reamer after drilling them.


3) Prepare the posts. In my case 1.6mm brass goes into 1.5mm holes, so I filed a taper on the end of each post until it would fit through the 1.5mm hole and have ~3mm of the tip sticking out.


4) For riveting you'll need a jig. £3 cheapo pliers worked for me. File the jaws until they are slim enough to hold rollers with the smallest spacing between posts that you have in your design.

5) Be sure to anneal the post tips before riveting. Otherwise hardened brass can shatter and break off instead of mushrooming when you are trying to rivet it into the rollers.
Rivet the posts into the holes. Carefully file off the excess brass.



That's it! Simples. You can now design & build your own bass machine. No more loitering around dumpsters waiting for somebody to throw away a melodeon with a working bass machine.
For mounting I used PTFE inserts glued with CA into wooden support blocks (file deep grooves in PTFE for CA to grab!). Drill 4mm holes with 5mm step between centers, then ream them out with 4.1mm reamer for 4.0mm rollers.
There are many alternative options though.

